Consultancy Services at Energy
Regulatory Commission
Description:
Consultancy Services for the Kenya Electricity Supply System Study
Background
The electricity supply system in Kenya is challenged in the delivery of a
consistent supply of electrical power of acceptable quality and
reliability. The transmission and distribution system is severely
constrained, particularly during peak hours, when system voltages in
parts of Nairobi, Western and Mt. Kenya Regions drop below acceptable
levels. This has occasioned power supply interruptions, despite
availability of adequate generation capacity to meet demand.
To address this anomaly, the Government of Kenya has received financing
from the World Bank towards the cost of the Energy Sector Recovery
Project and intends to apply part of the proceeds towards a detailed
study of the interconnected electric power supply system. The project
will be implemented by the Energy Regulatory Commission (ERC).
ERC, established under the Energy Act, 2006, is an autonomous energy
sector regulatory agency, with responsibility for economic and technical
regulation of electric power, downstream petroleum activities and
renewable energy sub-sectors.
Objective of the assignment
The objective of this study is to analyze the power supply system during
normal and fault conditions, carry out system modeling, load flow
studies, establish reactive power requirements, transmission constraints
and recommend remedial measures complete with economic and financial
analysis, taking into account the ongoing and committed projects, to
enable corrective actions to be taken in optimizing the design,
function, operation, protection and control of the system.
Scope of services
The scope of System Study shall include:-
1. Appropriate network studies for the system as it exists and as it
expands in the near term (of three to five years).
2. Determination of reactive power compensation requirements to maintain
desired system voltages and optimal transmission efficiency and
recommend the best compensation equipment at optimal locations in the
network.
3. Making of recommendations for optimization measures and necessary
improvements for the power supply system, as it exists now and expands
in the near term in accordance with the Least Cost Power Development
Plan (LCPDP), to meet agreed system reliability standards.
4. Identification of constraints in the transmission system that may
hinder optimal power transfers at desired quality, level of losses and
system security standards, and recommend remedial measures, taking into
account the ongoing and committed projects.
5. Determination of the optimum transmission voltages and system
configuration requirements for selected voltages taking into account
technical losses, future power transfer needs within the country as well
as the on-going developments in the Eastern Africa region.
Criteria
Interested eligible firms must meet the following criteria:
· Submit company profile, certificate of registration and audited
accounts for the last 3 years.
· Demonstrate experience in:-
1. Power system planning including demand forecast, generation,
transmission and distribution planning; and undertaking economic and
financial analysis;
2. Power system analysis and system operations;
3. Generator governor and excitation control systems and modeling, as
well as modeling of wind farms and embedded generation;
4. Telecommunications and SCADA systems, and
5. Carrying out similar assignments (include a suitable work-plan with
clearly identified deliverables).
· Provide signed CVs for the following key personnel; Team Leader with
at least twelve (12) years experience in electrical engineering, and
other Experts with at least eight (8) years experience in Power System
Planning, Analysis and Operations, Design and Construction, Protection,
Generator Governor and Excitation Control Systems and Modeling,
Telecommunications and SCADA Systems, as well as Energy Economics and
Financial Analysis.
· The EOI should be submitted in four (4) hard bound copies to the
address stated here below.
The consulting firm will be selected in accordance with the procedures
set out in the World Bank’s Guidelines: Selection and Employment of
Consultants by World Bank Borrowers (current edition).
Completed Expressions of Interest documents in plain sealed envelopes
clearly marked “ERC/PROC/4/4/ 10-11/039 – CONSULTANCY SERVICES FOR THE
KENYA ELECTRICITY SUPPLY SYSTEM STUDY” should be addressed to;
The Director General
Energy Regulatory Commission
1st Floor, Eagle Africa Centre, Longonot Road, Upperhill
P.O. Box 42681 – 00100
Nairobi, Kenya.
Telephone: +254-20-2847000/200, Fax: +254-20-2717603
Email: info@erc.cio.ke
Website: http//www.erc.go.ke
and deposited in the Tender Box situated on 15th Floor, Eagle Africa
Centre, Longonot Road, Upperhill, Nairobi or sent by post so as to reach
the above address not later than Friday, 21st January, 2011 at
1100 hours (local time).
Electronic expressions of interest are not permitted.
No comments:
Post a Comment